Heavy Haul Windmill Motors Delivered for Renewable Energy Project
Project Overview
Client: Wind Energy Contractor - Gillette, WY
Freight Hauled: (3) Windmill Nacelle Motors
Weight per Unit: 150,000+ lbs each
Route: Pueblo, CO to Gillette, WY
Scope: 3 superloads transported to remote wind farm under strict routing and environmental regulations
Industry: Renewable Energy / Wind Power
Challenge: 3 Superloads Bound for a Remote Wind Farm
As part of a major turbine upgrade in northeastern Wyoming, a wind energy contractor purchased three replacement windmill motors (nacelles) from a manufacturing facility in Pueblo, Colorado. Each unit weighed over 150,000 lbs, and had to be delivered safely and efficiently to a remote wind farm site near Gillette, WY.
This high-value, oversize freight posed several challenges:
Extreme weight and dimensions required route surveys, bridge studies, and multi-axle trailers.
Remote delivery location with unpaved access roads and limited turnaround space.
Permit coordination across state lines with strict regulations around superloads.
Tight project timeline to align with on-site crane and installation crews.
Our Solution: Engineered Transport for Green Energy
Rocky Mountain Heavy Haul managed the project from start to finish, applying our in-house expertise in logistics engineering and heavy equipment transport:
Pre-move engineering: Our team conducted thorough route analysis and permit research for Colorado and
Wyoming, identifying load-bearing bridge restrictions and unpaved access challenges.
Specialized equipment: We deployed multi-axle hydraulic RGN trailers equipped with steerable rear axles
and load equalization systems to manage the superload dimensions and weight.
Escort & pilot coordination: We arranged state-approved pilot car escorts and front/rear support vehicles for all three moves.
Staged delivery: The motors were loaded one per day, transported safely under superload permits, and delivered directly to turbine pad sites within 72 hours total.
On-site coordination: We worked with wind farm contractors and crane teams to ensure synchronized unloading and minimal downtime.
Results: Green Power Project Delivered Without Delay
3 superloads delivered on time and on budget
Zero incidents during transport or unloading
Compliant with DOT and wind farm safety standards
Helped accelerate turbine replacement and energy production timeline
Client Testimonial
“These motors are critical components, and we needed them delivered safely and fast. Rocky Mountain Heavy Haul exceeded expectations with their knowledge, equipment, and coordination. Their team was professional every step of the way.”
Conclusion
This project is a testament to Rocky Mountain Heavy Haul's ability to support the growing renewable energy sector with precise, reliable, and compliant heavy freight transport. Whether hauling components for wind, solar, or utility infrastructure - we move what powers the future.